LockedHosting Controller Scheduled Maintenance/Upgrade

Author
HC Team
Hosting Controller
2009/07/04 14:15:27 (permalink)

Hosting Controller Scheduled Maintenance/Upgrade

We will do schedule maintenance and upgrade to new Hosting Controller support portal from next week.
 
To ensure uninterrupted service, we plan to switch to new system after midnight PST. You might face some downtime during this migration. It's late at night, so not much should be obstructed.
 
  Date: 07/06/2009 to 07/11/2009
  Start time (US PST): 00:00:00
  End time (US PST): 03:00:00
 
post edited by HC Support - 2009/07/04 14:16:43
#1

0 Replies Related Threads

    Jump to: