Let me know how you get on mate, we are moving from a single 2003 box to a NLB cluster, currently testing stuff, should be able to test hc 6.1 on the cluster tonight see wht it can and can¬t do.
Extra note when we hv the hc backup service running on our box the server bcomes very very very slugish, i.e. accessing rdp, running tasks become slow, not sure if theirs a bug or something.
Anyways we will be migrating from the one box to a two node cluster, all though their both w2k3 and sql 2005 it will be interesting if ur migration between the two different OS goes well.